Off To The Next One
Main Index < Travels < UK 2006 < Canal Boating July 25 < Off To The Next One
[ PREVIOUS ] [ INDEX ] [ NEXT ]
UK 2006 : Slide 147 of 488
[ PREVIOUS ] FIMG_3485.jpg : 800 x 600 jpg 148.97k Jul 25, 2006 [ NEXT ]
  [ Click on the Pic to Expand to Full Size (FIMG_3485.jpg : 800 x 600 148.97k Jul 25, 2006) ]  

Here was our routine: Walk to lock, When the downstream paddles on the previous locks are opened, crank open the upstream paddles to fill the lock. Open upstream doors. As the boats come in, the next team goes down to the next lock and starts. Team one closes upstream the gates and paddles and opens downstream paddles. Boats sink to the lower water level, open gates and let them out. Close gates and paddles and move down past the one that the boats should now be entering.







Text Last Modified Thu Aug 31 08:52:06 2006
Check out our Trip Diary for this day on Kel's pages.
[ PREVIOUS ] [ INDEX ] [ NEXT ]
UK 2006 : Slide 147 of 488
Main Index < Travels < UK 2006 < Canal Boating July 25 < Off To The Next One

Main Index Main Disneyland Index Our House Family Related Photos Dis-Armed and Dangerous Mail Me Kel's Page
Powered by Apache Powered by FreeBSD Valid HTML 4.0!
Taking up valuable Internets space and clogging the tubes for over 10 years!!!
Site contents Copyright © 1996 - 2010, by Leonard Vinci
Please do not use the contents of these pages without written permission. That includes
linking to any of the pictures or quoting any of the text. Thank you!