Due to not holding water AT ALL after Phase two, we through plywood over it all and took a 2 month break. A two month break during which I was laid off from my job, we played Travel Host to a friend from the UK, we went to Tokyo, and had 2 BBQs. Not much of a break eh :-)

What you see here is the pond after trying to waterproof it with caulk (the running gray stuff) which did not work completely, then a coat of thinset, which did work, but was ugly. At the point you see it here it would hold water up to the original concrete skirt.

Text Last Modified Wed Sep 17 13:11:16 2003
[ PREVIOUS ] [ INDEX ] [ NEXT ]
Pond Project 2003 : Slide 18 of 35
Main Index < Our House < Pond Project < Two Months Later

Main Index Travel Adventures Main Disneyland Index Family Related Photos Dis-Armed and Dangerous Mail Me Kel's Page
Powered by Apache Powered by FreeBSD Valid HTML 4.0!
Taking up valuable Internets space and clogging the tubes for over 10 years!!!
Site contents Copyright © 1996 - 2010, by Leonard Vinci
Please do not use the contents of these pages without written permission. That includes
linking to any of the pictures or quoting any of the text. Thank you!